Not logged in [
Login
-
Register
]
You Are Not Registered Or Not Logged In
Corsa Sport
»
Message Board
»
Off Day
»
House Day
»
Photovoltaic Solar Panels
» Post Reply
Post Reply
Who Can Post?
All users can post new topics and all users can reply.
Icon:
Formatting Mode:
Normal
Advanced
Help
Andale Mono
Arial
Arial Black
Book Antiqua
Century Gothic
Comic Sans MS
Courier New
Georgia
Impact
Tahoma
Times New Roman
Trebuchet MS
Script MT Bold
Stencil
Verdana
Lucida Console
-2
-1
1
2
3
4
5
6
White
Black
Red
Yellow
Pink
Green
Orange
Purple
Blue
Beige
Brown
Teal
Navy
Maroon
LimeGreen
Message:
HTML is Off
Smilies are On
BB Code is On
[img] Code is On
[quote][i]Originally posted by whitter45[/i] [quote][i]Originally posted by Jules S[/i] [quote][i]Originally posted by Simon[/i] Bloody BREEAM! We've just completed a building that had to get an 'excellent' rating at design and post construction stages as part of the planning conditions. It's such a crap box ticking exercise [/quote] Indeed, We estimate it's about 5-7% added cost for sweet fuck all. But like you said, it's a box ticking exercise...and if you get 3 points for PV's? We missed the consultation period on a project (so missed all of those lovely consultation points :rolleyes: ) and still got very good. The result (with biomass) was a A4 certificate which now resides in an office. No user knows anything about the building, they simply ignore all of the gaff stuff we had to display. Hey ho, tax money wasted. Again. :rolleyes: [/quote] I think its more important to do post occupancy surveys as the majority of buildings I survey never operate to design spec due to poor commmisioning or end user disregard for energy [Edited on 14-10-2010 by whitter45] [/quote]
Post Options:
Disable smileys?
Turn BBCode off?
Receive email notification of new replies?
This is a long topic, click
here
to review it.