Not logged in [
Login
-
Register
]
You Are Not Registered Or Not Logged In
Corsa Sport
»
Message Board
»
Off Day
»
House Day
»
House Extension Project
» Post Reply
Post Reply
Who Can Post?
All users can post new topics and all users can reply.
Icon:
Formatting Mode:
Normal
Advanced
Help
Andale Mono
Arial
Arial Black
Book Antiqua
Century Gothic
Comic Sans MS
Courier New
Georgia
Impact
Tahoma
Times New Roman
Trebuchet MS
Script MT Bold
Stencil
Verdana
Lucida Console
-2
-1
1
2
3
4
5
6
White
Black
Red
Yellow
Pink
Green
Orange
Purple
Blue
Beige
Brown
Teal
Navy
Maroon
LimeGreen
Message:
HTML is Off
Smilies are On
BB Code is On
[img] Code is On
[quote][i]Originally posted by Pop[/i] Lots of progress this week; however, it's not the easiest to capture in pics as it would be more of a case of spot the difference with earlier updates. The hallway walls have been leveled off and the lintels removed that were above the old front door and hallway door. [IMG]http://i16.photobucket.com/albums/b31/english_tim/House%20Extension/IMG_1644_zpsd9cabde0.jpg[/IMG] Plaster board has started to go up, as well as insulation. Since this pic was taken lots more boarding has gone up in the new lounge. [IMG]http://i16.photobucket.com/albums/b31/english_tim/House%20Extension/IMG_1645_zpsb192d35a.jpg[/IMG] Most of the kitchen has been ripped out, leaving us with one cupboard, the sink and cooker. [IMG]http://i16.photobucket.com/albums/b31/english_tim/House%20Extension/IMG_1646_zpse9e2d274.jpg[/IMG] I got a copy of the kitchen elevation drawings from Howdens yesterday and the builders are going to mark out the positioning for the higher level cupboards. This will be a guide for the plumber who is due to fit a new boiler in a new location (hidden behind a cupboard). The electrician is due back soon to do work in the kitchen and the other rooms before any plastering can begin. [/quote]
Post Options:
Disable smileys?
Turn BBCode off?
Receive email notification of new replies?
This is a long topic, click
here
to review it.