Not logged in [
Login
-
Register
]
You Are Not Registered Or Not Logged In
Corsa Sport
»
Message Board
»
Off Day
»
House Day
»
House Extension Project
» Post Reply
Post Reply
Who Can Post?
All users can post new topics and all users can reply.
Icon:
Formatting Mode:
Normal
Advanced
Help
Andale Mono
Arial
Arial Black
Book Antiqua
Century Gothic
Comic Sans MS
Courier New
Georgia
Impact
Tahoma
Times New Roman
Trebuchet MS
Script MT Bold
Stencil
Verdana
Lucida Console
-2
-1
1
2
3
4
5
6
White
Black
Red
Yellow
Pink
Green
Orange
Purple
Blue
Beige
Brown
Teal
Navy
Maroon
LimeGreen
Message:
HTML is Off
Smilies are On
BB Code is On
[img] Code is On
[quote][i]Originally posted by Pop[/i] No update for last week as not a lot happened! This was mainly due to a delay on the windows and front door, which are now due this week. The only points of note were that SGN came back to reinstate the drive and the steel and support for in the kitchen were delivered. Fast forward to today and they have started work inside the house. I knew it was going to be dusty but upon opening the front door there is a sea of beige. We're telling ourselves that it will be good in the end. The back wall of the kitchen has started to come come out and you can see the props in place ready for when the steel goes in. [IMG]http://i16.photobucket.com/albums/b31/english_tim/House%20Extension/IMG_1506_zpsa4d4e671.jpg[/IMG] Opening the door to the downstairs cloakroom I was surprised (but happy) to see it has now been taken out, including the walls. [IMG]http://i16.photobucket.com/albums/b31/english_tim/House%20Extension/IMG_1507_zps27e8e458.jpg[/IMG] [IMG]http://i16.photobucket.com/albums/b31/english_tim/House%20Extension/IMG_1508_zpsbde14def.jpg[/IMG] There's not a lot stopping them partitioning the bathroom and home cinema room now. Last pic for this update. You can see where the old gas meter and piping used to be, with the new pipe running along the floor. This had to be re-routed as it was at head height for the new doorway. The electric meter is still in position, which is slap bang in the middle of where the doorway will be cut out. This will all be moved this month once some plastering has been done in the new hallway. [IMG]http://i16.photobucket.com/albums/b31/english_tim/House%20Extension/IMG_1509_zpsf772eca6.jpg[/IMG] [/quote]
Post Options:
Disable smileys?
Turn BBCode off?
Receive email notification of new replies?
This is a long topic, click
here
to review it.